94. |
SOCAR PETKݍ, PA (Phthalic Anhydride) Plant Revamp Project Civil – Erection Works |
2012/.... |
|
93. |
ISDEMIR Sinter Plant No.2, Engineering, Civil Works, Manufacturing, Erection, Steel Structure Manufacturing & Erection, Electrical and Instrumentation, Dismantling and Relocation Works, 3.200.000 t/y. ISKENDERUN |
2010/2011 |
|
|
92. |
ISDEMIR, No.7 Pump Station and Rain Water Main Channel Modification and Improvement Works. ISKENDERUN |
2009/2009 |
|
|
91. |
CIMPOR YIBITAޠHasano졮 Cement Factory, Cement Silo and Handling System, Manufacturing, Construction, Installation Works, 5500 m3. ANKARA |
2007/2008 |
|
|
90. |
ݓDEMݒ, PCI Landscaping, Construction of Blast Furnace Stove Gas Line, Fire Protection Water Tank and Pump Building Works. ݓKENDERUN |
2007/2008 |
|
|
89. |
ݓDEMݒ, Blast Furnace No:4 Raw Material Handling Lines, Engineering, Manufacturing, Construction, Installation Works. ݓKENDERUN쯰> |
2007/2008 |
|
|
88. |
ݓDEMݒ, Steam Boilers, Steel Structure Works.
ݓKENDERUN |
2006/2007 |
|
|
87. |
ݓDEMݒ, No:1 and 2 Slab Reheating Furnace Construction and Erection Works, 2 x 400 t/h. ݓKENDERUN |
2006/2008 |
|
|
86. |
ݓDEMݒ, 1600 m3孩neralized Water Tank, Manufacturing and Installation Work. ݓKENDERUN쯰> |
2006/2006 |
|
|
85. |
ݓDEMݒ, No:6 and 7 Steam Boilers, Construction of Reinforced ConcreteӴack, 110m. ݓKENDERUN |
2006/2007 |
|
|
84. |
ݓDEMݒ, Blast Furnaces Pulverized Coal Injection Facility, Construction, Manufacturing, Installation Works, 1.000.000 t/y.퓋ENDERUN |
2005/2006 |
|
|
83. |
ݓDEMݒ, Construction of No: 3 Blast Furnace Steel Stack, 65 m.
ݓKENDERUN |
2006/2006 |
|
|
82. |
ERDEMݒ, No:4 Slab Reheating Furnace Civil Works and Process Installation, 220 t/h. Kdz. Ere쩠- ZONGULDAK쯰> |
2004 / 2005 |
|
|
81. |
E܁ެ Tun碩lek Power Plant, Rehabilitation of 5. Unit Concrete Stack. KܔAHYA쯰> |
2003 / 2004 |
|
|
80. |
ENERJݓA, Installation Works of 42 MW GT 6000 BEV Gas Turbine and Auxiliary Facilities. ǁNAKKALE |
2002 / 2002 |
|
|
79. |
Transfer of Operational Rights (TOR) of coal fired Yataᮠ(630 MW) Kemerk頨630 MW) and Yenik頨420 MW) power plants from TEAS by INTERNATIONAL POWER PLC (UK), VAKIF ENERGY Inc., ANKARA ENERGY AND PRODUCTION Inc. and MݍAG Inc.㯮sortium. MUЌA (Delivered back to TEAީ |
1997 / 2006 |
|
|
78. |
Realisation of 770 MW Ankara Natural Gas Fired CCGT Project on BOO (Built-Own-Operate) basis by SUEZ ENERGY INTERNATIONAL - SEI (PRIMEROFIN B.V., TELFIN S.A., COMPAGNIE EUROPEENNE DE DEFINANCEMENT S.A, BELGELECTRIC FINACE B.V.) and흍AG Inc. Consortium. ANKARA 쯰> |
1998 / 2018 |
|
|
77. |
TMO (Turkish Grain Authority), Harbour Silo at Derince. Rehabilitation
of Earthquake Damages and Measures for the Protection against
Earthquakes. Derince - ݚMݔ |
2001 / 2002 |
|
|
76. |
BAYMݎA ENERGY S.A., Malik預reliminary School Construction Works, Polatl�NKARA࠼/p> |
2002 / 2002 |
|
|
75. |
E܁ެ Ambarl௷er Plant, 4. and 5. Group Stacks Construction.
ݓTANBUL쯰> |
2000 / 2000 |
|
|
74. |
STANDARD FASEL-LENTJES (MODERN ENERGY) Heat Recovery Steam Generator (HRSG), Installation Work, 66t/h. K맶z - ǏRLU쯰> |
2000 / 2000 |
|
|
73. |
UNIMAR, 480 MW Combined Cycle Gas Turbine (CCGT), Complete Periodical Maintenance Works. MARMARA EREЌݓݠ༯p> |
2000 / 2000 |
|
|
72. |
ZORLU ENERGY 42 MW Combined Cycle Gas Turbine (CCGT), High Pressure Steam Distribution Pipes, Erection, Testing And Commissioning Works. L܌EBURGAZ.쯰> |
2000 / 2000 |
|
|
71. |
DIRECTORATE OF NATIONAL EDUCATION, HASANKADI Preliminary School Construction Works. BARTIN쯰> |
2000 / 2000 |
|
|
70. |
TMO, 60 tons capacity Electronic Weighbridges Stations for Loading and Unloading (5 units)쯰>
|
1999 / 2000 |
|
|
69. |
ZORLU ENERGY; Bursa Power Station, 35 MW Second Combined Cycle System Steam Turbine, Condenser and Piping Installations, Tests and Commissioning Works. BURSA쯰> |
1999 / 2000 |
|
|
68. |
ZORLU ENERGY; Combined Cycle Power Plant, Naphta Tanks.
LULEBURGAZ쯰> |
1999 / 2000 |
|
|
67. |
TEKSER (BOSEN); Waste Heat Boiler, 100t/h Steam Turbine Generator, Condenser and Auxiliary Machinery & Equipment. Complete Installation, Testing and Commissioning Works. BURSA쯰> |
1999 / 1999 |
|
|
66. |
TMO - Repairing and Commissioning Work of Seaport-Silos.
ݚMݔ쯰> |
1999 / 1999 |
|
|
65. |
ZORLU ENERGY; "42 MW, LM6000 gas-turbine-generator" installation, testing and commissioning works, L܌EBURGAZ쯰> |
1999 / 1999 |
|
|
64. |
BIS ENERGY, "45 MW Steam Turbine" Installation, Testing and Commissioning Works. BURSA |
1998 / 1999 |
|
|
63. |
ZORLU ENERGY,"42 MW, LM6000 Gas-Turbine-Generator" Installation, Testing And Commissioning Works. BURSA쯰> |
1998 / 1999 |
|
|
62. |
GSD. (BIS ENERGY), Waste Heat Recovery Generator's Piping And Instrument Installation Works. BURSA쯰> |
1998 / 1998 |
|
|
61. |
ZORLU ENERGY; Manufacturing and Installation of Naphta Tank for Combined CycleЯwer Plant. BURSA쯰> |
1998 / 1999 |
|
|
60. |
TEKSER (BOSEN), "50 MW Westinghouse Gas-Turbine-Generator" Installation, Testing And Commissioning Works. BURSA |
1998 / 1998 |
|
|
59. |
NOOTER/ERIKSEN (BIS ENERGY), Waste Heat Recovery System Erection With Stack Manufacturing And Erection Works, with a capacity of 87 t/h steam and 47 t/h Hot Water. BURSA쯰> |
1998 / 1999 |
|
|
58. |
MITSUI&CO-TURK TRACTOR FACTORY, Security System Installation Works. ANKARA쯰> |
1998 / 1998 |
|
|
57. |
BIS ENERGY, "42 MW, LM6000 Gas-Turbine-Generator" Installation, Testing And Commissioning Works. BURSA쯰> |
1998 / 1998 |
|
|
56. |
BISAެ High Pressure Steam Piping Between BݓAޠAnd Bis Energy Gas Fired Combined Cycle Power Plant. BURSA쯰> |
1998 / 1998 |
|
|
55. |
ZORLU ENERGY, "35 MW, LM2500 Gas-Turbine-Generator And Steam-Turbine-Generator" Installation, Testing And Commissioning Works. BURSA |
1998 / 1998 |
|
|
54. |
UNI-MAR, "480 MW 2 units of Gas-Turbine-Generator and 1 unit of Steam-Turbine-Generator" Installation, Testing and Commissioning Works. MARMARA EREЌݓݠ |
1997 / 1998 |
|
|
53. |
BIS ENERGY, "38 MW, G.E.60001B/Frame 6 type Gas-Turbine-Generator" Installation, Testing And Commissioning Works. BURSA쯰> |
1997 / 1997 |
|
|
52. |
TMO, 7 units of Truck Lifting Platforms, Design, Supply, Installation and Commissioning Works. |
1996 / 1998 |
|
|
51. |
BUSKI Rehabilitation of Demirta㯬id Waste Dumping Site.
BURSA ﰾ |
1994 / 1996 |
|
|
50. |
ǁMSAN, Medium Density Fibreboard Factory, Main and Anvillary Buildings Construction Equipment Supply and Installation. ORDU࠼/p> |
1994 / 1995 |
|
|
49. |
BISAެ "50 MW Combined Cycle Power Plant LM5000 Steam Injected Gas-Turbine And Generator" Installation, Testing and Commissioning Works. BURSA쯰> |
1993 / 1993 |
|
|
48. |
TMO, 39 no.s 60 tons Weighbridge Stations for Loading and Unloading Stations at 39 Sites.쯰> |
1992 / 1993 |
|
|
47. |
105 MW Gas Power Plant Dismantling, Transportation and Installation. SEYDݞEHIR / NAHCIVAN쯰> |
1992 / 1993 |
|
|
46. |
AZERBAIJAN ELECTRICITY AUTHORITY; 154 kV, Transmission Line, 90 km. IЄIR - TURKEY / NAHCEVAN - AZERBAIJAN. |
1992 / 1992 |
|
|
45. |
Construction of 2 Reinforced Concrete Cement Silos. Hasano졮
ANKARA쯰> |
1991 / 1991 |
|
|
44. |
Manufacturing and Erection R/L Towers for PTT Administration (7 locations) |
1991 / 1991 |
|
|
43. |
TCDD, ݳkenderun-Divri頒ailway Electrification Project, Supply of Catenary Hardware and Installations. |
1990 / 1990 |
|
|
42. |
380 kV Transformer Substations (MݍAG-BOYTAީ. SݎCAN, GAZ݁NTEP, DݙARBAKIR |
1989 / 1992 |
|
|
41. |
Turkish State Railways Sincan-Eskisehir Railway Electrification,
280 km. (IRCON-INDIA / MݍAG) |
1989 / 1991 |
|
|
40. |
PTT Members Cooperative, 400 unit of Dwelling House Construction and Heating Centre. ANKARA |
1987 / 1987 |
|
|
39. |
WEST ANATOLIA Cement Factory, construction 2 no.s Post Tensioned Reinforced Concerete Cement Silo. ݚMݒ쯰> |
1987 / 1987 |
|
|
38. |
TMO, 210 000 tonnes Capacity Steel Silos and Ancillary Buildings, (Attila DoᮠConstruction and Installation Co., Phenix Rousies S.A., MIMAG Construction and Trade Inc.)쯰> |
1987 / 1989 |
|
|
37. |
Ankara Metropolitan Municipality, K⽳ Village Bitumen Tanks, Hot Oil and Heating Facilities鮳tallations. ANKARA࠼/p> |
1987 / 1987 |
|
|
36. |
ET݂ANK, Maz᰽ Social Facilities Heating Centre and 2 Stack Construction. MARDݎ쯰> |
1986 / 1986 |
|
|
35. |
Esenbo᠁irport Control Tower Construction.
ANKARA༯p> |
1985 / 1985 |
|
|
34. |
TEK, Afocial Facilities Heating Centre Stack Construction.
AFޝN࠼/p> |
1985 / 1985 |
|
|
33. |
GֈAS, Atat렌ung Dieases Centre Rehabilitation Construction.
ANKARA࠼/p> |
1985 / 1985 |
|
|
32. |
Karabɲon and Steel Works, 2. Coke Battery Stack and Gas Channels Construction. KARAB܋ |
1985 / 1985 |
|
|
31. |
TUSAެ Medium Voltage Substation Building Construction. M䥤
ANKARA࠼/p> |
1985 / 1985 |
|
|
30. |
MKEK, ǡnk�ilitary Weapons Factory, Heating Centre Construction.
ǁNKIRI |
1984 /1984 |
|
|
29. |
Efes Pilsen Anatolia Malt and Brewery Factory, 5000m3ᴥr Tank, Waste Water and Infrastructure Construction. ǕMRA쯰> |
1983 / 1985 |
|
|
28. |
TEK, Kangal Thermal Power Plant, 2 no.s Reinforced Concrete Stacks Construction, 120m. Kangal - SݖAS쯰> |
1983 / 1985 |
|
|
27. |
Slipforming Consultancy, Karakaya Railroad Bridge Construction.쯰> |
1982 / 1982 |
|
|
26. |
TRT, Elbistan TV Transmitting Station and Ancillary Buildings Construction. ELBݓTAN쯰> |
1982 / 1986 |
|
|
25. |
Efes Pilsen Anatolia Malt and Brewery Factory, 30 000 tonnes Silo, Machine House, Loading and Unloading Facilities Construction. ǕMRA쯰> |
1982 / 1984 |
|
|
24. |
Aziz Ya㽠Flour Factory, Silo Construction,10.000 t.
UZUNKRܠ |
1982 / 1982 |
|
|
23. |
Ministry of Defence, GATA Heating Centre Construction.
ANKARA쯰> |
1981 / 1982 |
|
|
22. |
TEK, ǡy衮 Thermal Power Plant, 2 no.s Reinforced㴡ck Construction,120m. ǡy衮 - ANKARA쯰> |
1981 / 1982 |
|
|
21. |
National Intellegence Agency, Heating Centre Construction.
ANKARA쯰> |
1981 / 1982 |
|
|
20. |
Ere쩠Iron and Steel Works, Dressing and Washing Building.
EREЌݠ |
1980 / 1981 |
|
|
19. |
Thrace Oil Seed Agriculture and Trade Cooperative Association, ǯrlu Grain Silo Construction 8.000 t. ǏRLU쯰> |
1980 / 1981 |
|
|
18. |
Dwelling House Construction. Gaziosmanpa좲 />
ANKARA |
1980 / 1983 |
|
|
17. |
EGE Malt and Brewery Co., Akk頒einforced Concrete Barley Silo Construction10,000 t. KONYA쯰> |
1979 /1980 |
|
|
16. |
EGE Malt and Brewery Co., Silo and Mill Pile Foundation Construction.
ݚMݒ |
1978 / 1978 |
|
|
15. |
EGE Malt and Brewery Co., Ac幵 Reinforced Concrete Barley Silo Construction,10.000 t. KONYA쯰> |
1979 / 1980 |
|
|
14. |
EGE Malt and Brewery Co. ݺmir Beer Factory, Reinforced Concrete Silo Construction, 5.000 t. ݚMݒ |
1978 / 1978 |
|
|
13. |
EGE Malt and Brewery Co., Afyon Malt Factory Dosage Silo Construction, 3.000t. AFYON쯰> |
1978 / 1978 |
|
|
12. |
Turkish Pulp and Paper Industries, Akdeniz Paper Mill Water Supply Facilities Construction. S݆KE |
1978 / 1981 |
|
|
11. |
Ankara Golf Club Security Facilites Construction.
ANKARA쯰> |
1978 / 1978 |
|
|
10. |
TCDD, Sivas Concrete Sleeper Factory, Aggregate Silos and Pile Foundation Construction. SݖAS࠼/p> |
1978 / 1978 |
|
|
09. |
PETLAS, Tire Factory Security Facilities Construction.
KIRޅHݒ쯰> |
1978 / 1978 |
|
|
08. |
MKEK, Polatl㯮struction Machines Factory, Security Facilities Construction. POLATLI |
1978 / 1978 |
|
|
07. |
MKEK, ǡnk�ilitary Weapons Factory, Security Facilities Construction. ǁNKIRI쯰> |
1977 / 1978 |
|
|
06. |
State Airports Administration, Airport Control Tower Construction.
ADANA쯰> |
1977 / 1977 |
|
|
05. |
State Airports Administration, Airport Control Tower Construction.
TRABZON쯰> |
1976 / 1976 |
|
|
04. |
State Airports Administration, Airport Control Tower Construction.
ANTALYA쯰> |
1976 / 1976 |
|
|
03. |
Ministry of Culture and Tourism, Museum Construction.
ǁNKIRI쯰> |
1976 / 1976 |
|
|
02. |
Office Building Construction.
HACIBEKTAޠ |
1975 / 1975 |
|
|
01. |
Ministry of Culture and Tourism, Museum Construction.
HACIBEKTAޠ |
1975 / 1976 |
|
|