Engineering, construction, manufacturing and erection of machinery equipment, electrical and instrumentation, no-load testing, commissioning, load testing, technical issues related works that are going to be arise in engineering, manufacturing-installation stage and for making the system work, Relocation works to operationalise site, Modification Works for Dosing, Crushing-Screening Units within the scope of ݓDEMݒ Modernization and Transformation Investments for production of sinter with a capacity of 3.200.000 t/y. |