770 MW Ankara Natural Gas Combined Cycle Power Plant (CCGT)
CLIENT
Baymina Enerj A.Ş./Tractebel S.A. (BELGIUM) Mimag İnşaat ve Ticaret A.Ş.
PLACE
Maliköy - ANKARA
DESCRIPTION
770 MW Ankara Natural Gas Cobmined Cycle Power Plant (CCGT), (2 nos. GE-PG9351 (FA) (2x225 MW) Gas Turbines , 2 nos. Recovery Heat Boilers (CMI-BELGIUM) and 1 no Steam Turbine (320 MW – Alstom), Average Annual Generation is 5.5. billion KWh), It has been realised Built-Own-Operate basis by SUEZ ENERGY INTERNATİONAL (SEI) and MIMAG Consortium.