As subcontractors to IRCON (India Government Facility), below mentioned works were
carried out for TCDD General Directorate along the 230 km (280 track-km) Sincan-Eski該 Railway Track.
a) Supply, erection and foundations of 4.800 ea. centrifuged RC posts.
b) Manufacturing and installation of 800 tonnes of galvanized (bolted + welded) steel
portal frames in form of space trusses for catenary.
c) Fabrication and supply of 250 tonnes of galvanized steel hardware required for 280
km long track. |